Maintenance of ventilation systemsService spectrum:
- All DWG and DXFFormate can project planning for climatic and ventilation systems, if necessary also as 3D planning with Rukon program, be converted
- Large-scale installations for centers ect. with 180.000 m3/h
- Maintenance of plants
- According to the VDI 6022 guideline the plant inspection and cleaning suitable methods further with camera trip and cleaning robot, as well as.
- Special designs in the building of sheet metals from galvanized steel sheet and high-grade steel or aluminum
- Connection in crease or welding engineering
- Building of central dust August plants in dwellings and floors
- Building of special devices for special targeted applications (activated charcoal filter plant in kitchen circulating air hood, activated charcoal exhaust air under that bar on a ship) and on special customer's request
- Building of dust extracting installations for Tischlereien and welding shops
- Large volume building of ventilation for trade kitchens with high-grade steel kitchen covers (amount of air 23,000 m3/h)
- Processing from sheet metals to air duct parts

